Project Name
|
Demonstration
|
Acres Proposed
|
100
|
|
Project ID
|
02-01
|
Acres Treated
|
65
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
9
|
|
Economic Action
|
$55,000
|
Description
|
|
Title III
|
|
Treat 100 acres of Hazardous Fuels and
create demonstration areas on undetermined non-industrial private lands
and to hire a Registered Professional Forester to oversee the project.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Brian Wayland
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Plumas Eureka
|
Acres Proposed
|
50
|
|
Project ID
|
02-07
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
1
|
|
Title II
|
$50,000
|
Description
|
|
Title III
|
$32,000
|
Treat Hazardous Fuels on USFS managed lands
adjacent to Plumas Eureka.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Indian Falls
|
50
|
|
|
Project ID
|
03-02
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
6
|
|
Title II
|
$47,800
|
Description
|
|
Title III
|
$9,000
|
Treat
50 acres of Hazardous Fuels in Indian Fall community common area and to
hire a Registered Professional to design the project. Hand &
Mechanical thinning - Adjoins public lands
Final
Report: Indian Falls
Final 12/31/2006
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Brian Wayland
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Camp Layman
|
Acres Proposed
|
50
|
|
Project ID
|
03-04
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
1
|
|
Title II
|
$47,500
|
Description
|
|
Title III
|
$22,500
|
Provide for the planning and treatment of 50
acres of HFR on public lands administered by the Plumas NF
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
US Forest Service
|
Treatment Contractor |
USFS Crew (Force Account)
|
|
| Top of
Page |
|
Project Name
|
Long Valley
|
Acres Proposed
|
350
|
|
Project ID
|
03-06
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
Title II
|
$84,000
|
Description
|
|
Title III
|
$15,000
|
Treat 350 acres of Hazardous Fuels in Long
Valley community and to hire a Registered Professional to design the
project. Hand & Mechanical thinning - Adjoins public lands
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Brian Wayland
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Graeagle Fuelbreak
|
Acres Proposed
|
200
|
|
Project ID
|
|
Acres Treated
|
0
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
1
|
|
Title II
|
$75,000
|
Description
|
|
Title III
|
$15,000
|
Develop THP to treat 200 acres of Hazardous
Fuels in a fuelbreak to a higher standard than required by CA State
Forest Practices Act
Adjoin Public lands"
|
|
Landowner
|
$54,572
|
|
Fire Protection District
|
$15,000
|
|
CSD
|
$15,000
|
Implementation Contractor |
Pete Thill
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Quincy Community Services District
|
Acres Proposed
|
17
|
|
Project ID
|
03-10
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
1
|
|
Title II
|
$12,000
|
Description
|
|
Title III
|
$5,000
|
Treat 17 acres of Hazardous Fuels by either
chipping and/or burning small material along existing road surfaces,
along southern side of Quincy, on Quincy Community Services District
Lands
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Dan Howell
|
Treatment Contractor |
|
|
| Top of
Page |
|
|
Elderly or Disabled
|
Acres Proposed
|
50
|
|
Project ID
|
03-12
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
27
|
|
Title III
|
$26,200
|
Description
|
|
Title II
|
$50,000
|
Provide assistance to elderly or
disabled citizens who lack the physical or economic capacity to perform
their defensible space treatment to meet PRC 4291 in cooperation with
PRS Senior Connections
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Robert Gimbel |
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Delleker North
|
Acres Proposed
|
50
|
|
Project ID
|
03-16
|
Acres Treated
|
131
|
|
Funding Source
|
Amount |
|
|
Number of Parcels
|
2
|
|
Community Protection
|
|
Description
|
|
Landowner
|
|
Treat approximately, 60 acres of
Hazardous Fuels North of Delleker
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
Pew & Winningham
|
|
| Top of
Page |
|
Project Name
|
|
Acres Proposed
|
117
|
|
Project ID
|
04-01
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
|
Number of Parcels
|
7
|
|
Community Protection
|
$61,800
|
Description
|
|
Title II
|
$60,500
|
Treat up to 117 acres of Hazardous Fuels on
private parcels in C Road for hand and/or mechanical thinning.
|
|
Title III
|
$15,000
|
|
|
|
|
|
|
Implementation Contractor |
Brian Wayland
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Gold Mountain
|
Acres Proposed
|
360
|
|
Project ID
|
04-03
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
1
|
|
Title II
|
$140,000
|
Description
|
|
Landowner
|
$45,500
|
Hire a RPF for planning to treat
up to 360 acres of Hazardous Fuels on private lands adjacent to Gold
Mountain and abutting PNF lands. Hand piling &/or mechanical
mastication.
|
|
CSD
|
$15,000
|
|
Homeowner Association
|
$10,000
|
|
|
|
Implementation Contractor |
Pete Thill
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Canyon Dam
|
Acres Proposed
|
200
|
|
Project ID
|
04-04
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
1
|
|
Title II
|
$84,000
|
Description
|
|
USFS Appropriated
|
$53,900
|
Provide for the planning and treatment of
200 acres of Hazardous Fuel Reduction on public lands administered by
the Plumas NF
|
|
Title III
|
$40,000
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Red Clover Estates
|
Acres Proposed
|
117
|
|
Project ID
|
04-11
|
Acres Treated
|
92.2
|
|
Funding Source
|
Amount |
|
|
Number of Parcels
|
24
|
|
Title II
|
$128,000
|
Description
|
|
Title III
|
$15,000
|
Develop
THP and treat 117 acres of Hazardous Fuels in a fuelbreak to a higher
standard than required by CA State Forester Practices Act. Adjoins
public lands (shared with 04-07)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
|
Acres Proposed
|
121
|
|
Project ID
|
05-02/05-06
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
|
Number of Parcels
|
|
|
HFR-RFP Planning
|
$15,000
|
Description
|
|
HR 2389 Title II
|
$73,000
|
Hire A RPF for planning to treat up to 121 acres of Hazardous Fuels of
common areas (Shared w/05-CAFSC-1 or 05-RAC-1)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Pete Thill
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Greenhorn Ranch CSD
|
Acres Proposed
|
30
|
|
Project ID
|
05-03
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HFR-RFP Planning
|
$10,000
|
Description
|
|
|
|
Hire A RPF for planning to treat
up to 121 acres of Hazardous Fuels of common areas (Shared w/05-CAFSC-1
or 05-RAC-1)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Grizzly Creek Rd
|
Acres Proposed
|
121
|
|
Project ID
|
05-04
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HFR-RFP Planning
|
$15,000
|
Description
|
|
|
|
Hire A RPF for planning to treat
up to 121 acres of HFR of private lands. (Shared w/05-CAFSC-2 or
05-RAC-3)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Mohawk Vista
|
Acres Proposed
|
|
|
Project ID
|
05-05
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title III
|
$15,000
|
Description
|
|
|
|
For education
and organization of property owners and planning a community fuels
reduction project.(Shared w/03-1, 06-2 & 06-5)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| |
|
| Top of
Page |
|
Project Name
|
Greenhorn
|
Acres Proposed
|
25.5
|
|
Project ID
|
05-07 See 07-08 for Rebid
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
20
|
|
HR 2389 Title II
|
$23,380
|
Description
|
|
|
|
Treat up to 30 acres of Hazardous
Fuels on CSD lands within the Greenhorn community
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Brian Weyland
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Grizzly Creek
|
Acres Proposed
|
|
|
Project ID
|
05-08
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$78,955
|
Description
|
|
|
|
Hire A RPF for planning to treat
up to 121 acres of HFR of private lands along Grizzly Creek Road.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
West Almanor Community HFR
|
Acres Proposed
|
17
|
|
Project ID
|
06-01
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
CA FSC–USFS Community Protection
- Title III
|
$8,294
|
Description
|
|
|
|
Treat up to 17 acres of Hazardous
Fuels on private parcels in the West Almanor Community. Joe
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Joe D. Smailes Forestry, Inc.
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Eastern Plumas HFR
|
Acres Proposed
|
125
|
|
Project ID
|
06-02
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
CA FSC–USFS Community Protection
|
$86,150
|
Description
|
HR 2389 Title II |
$36,260 |
Treat up to 125 acres of
Hazardous Fuels on private parcels in Mohawk Vista, C Road &
Portola/Delleker communities. (Shared w/ 03-1, 05-5 & 06-5)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Danielle Banchio
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Massack HFR
|
Acres Proposed
|
160
|
|
Project ID
|
06-03
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
CDF Prop 40
|
$114,300
|
Description
|
|
|
|
Treat up to 160 acres of
Hazardous Fuels on private lands in the Massack area.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Brian Weland
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Little Grass Valley HFR
|
Acres Proposed
|
111
|
|
Project ID
|
06-04
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$64,176
|
Description
|
|
|
|
Treat up to 111 acres of
Hazardous Fuels on private parcels in Little Grass Valley (Shared
w/06-10)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Eastern Plumas HFR
|
Acres Proposed
|
50
|
|
Project ID
|
06-05
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$36,260
|
Description
|
|
|
|
Treat up to 50 acres of Hazardous
Fuels on private lands in Mohawk Vista, C Road &
Portola/Delleker communities. (Shared w/ 03-1, 05-5 & 06-2)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Danielle Banchio
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Laporte Pines
|
Acres Proposed
|
75
|
|
Project ID
|
06-06
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$43,050
|
Description
|
|
|
|
Treat up to 75 acres of Hazardous
Fuels on public lands in La Porte Community
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
PC FSC Coordination
|
Acres Proposed
|
|
|
Project ID
|
06-07
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title III
|
$50,000
|
Description
|
|
|
|
Coordination of the Fire Safe Council and
community outreach and education with some HFR project development in
2005.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
West Almanor Community HFR Planning-RFP
|
Acres Proposed
|
11
|
|
Project ID
|
06-08
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title III
|
$5,000
|
Description
|
|
|
|
Hire A RPF for planning and
managing the treatment of 11 acres of Hazardous Fuels of CSD lands
within the community.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Massack HFR Planning – RPF
|
Acres Proposed
|
125
|
|
Project ID
|
06-09
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title III
|
$15,000
|
Description
|
|
|
|
Hire A RPF for planning and
managing the treatment of 160 acres of HFR of private lands in the
Massack area
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Little Grass Valley HFR Planning
|
Acres Proposed
|
|
|
Project ID
|
06-10
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$5,000
|
Description
|
|
|
|
Work with Little Grass Valley communities on
wildfire mitigation & evacuation planning (Shared w/06-4)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Indian Valley HFR
|
Acres Proposed
|
200 acres
|
|
Project ID
|
07-01
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
| CA
FSC – USFS Community Protection |
$191,560
|
Description
|
|
|
|
Treat up to 200 acres of Hazardous Fuels on
private parcels in the Indian Valley Area. (Shared w/07-4)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
La Porte
Rd. HFR
|
Acres Proposed
|
100 acres
|
|
Project ID
|
07-02
|
Acres Treated
|
154
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
11
|
|
CDF Prop 40
|
$10,000
|
Description
|
|
Secure Rural Schools Title III
|
$15,000
|
Hire A RPF for planning and managing the
treatment of 100 acres of Hazardous Fuels on private lands within the
community.
|
|
Sierra Nevada Conservancy (Pending)
|
$500,000
|
|
|
|
|
|
|
Implementation Contractor |
Danielle Banchio
NVRM
283-3739
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
PC FSC Coordination
|
Acres Proposed
|
|
|
Project ID
|
07-03
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR
2389 Title III
|
$64,659
|
Description
|
|
|
|
Coordination of the Fire Safe Council and
community outreach and education with some HFR project development in
2007.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Indian
Valley HFR Planning
|
Acres Proposed
|
200 acres
|
|
Project ID
|
07-04
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title III
|
$15,300
|
Description
|
|
|
|
Hiring a RPF for the planning associated
with treating up to 200 acres of Hazardous Fuels on private parcels in
the Indian Valley Area. (Shared w/07-1)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
C Road Right-of-Way Planning
|
Acres Proposed
|
|
|
Project ID
|
07-05
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title III
|
$8,500
|
Description
|
|
|
|
For the planning associated with fuel
reduction along C Road.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Taylorsville
Campground
|
Acres Proposed
|
35 acres
|
|
Project ID
|
07-06
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$35,000
|
Description
|
|
|
|
Treat 35 acre of private land above the
Taylorsville Campground
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Joe Smailes
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
C Road HFR
|
Acres Proposed
|
40 acres
|
|
Project ID
|
07-07
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$44,000
|
Description
|
|
|
|
Treat up to 40 acres of Hazardous Fuels on
private lands in the C Road community. Complements prior work with
projects 04-1, 2, & 8
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Greenhorn, HFR Treatment
|
Acres Proposed
|
30 acres
|
|
Project ID
|
07-08
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
|
HR 2389 Title II
|
$47,000
|
Description
|
|
|
|
Treat up to 30 acres of Hazardous Fuels on
CSD lands within the Greenhorn community (Shared with 05-7)
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Danielle Banchio
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Elderly/Disabled
Defensible Space
Assistance
|
Acres Proposed
|
|
|
Project ID
|
07-09
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
| HR 2389 Title II
|
$35,000
|
Description
|
|
|
|
Provide assistance to elderly or disabled citizens who
lack the physical or economic capacity to perform
their defensible space to meet PRC 4291
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
Rob Gimbel
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Countywide Educational Workshops
|
Acres Proposed
|
|
|
Project ID
|
07-10
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
| SNC- Prop 84
|
$40,000
|
Description
|
|
|
|
Provide 6-8 Educational workshops and supporting publication material to residents, businesses & organizations in Plumas County. Uses $28,000 of PC FSC Coordination funds as match.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
Gold Mtn. HFR
|
Acres Proposed
|
120 Acres
|
|
Project ID
|
08-01
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
| USFS Community
Protection
|
$82,833
|
Description
|
|
|
|
Treat up to 120 acres of Hazardous Fuels on private
parcels adjacent to the Gold Mtn. Community
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
RPF Pete Thill at (530) 836-2751.
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
PC FSC Coordination
|
Acres Proposed
|
|
|
Project ID
|
08-02
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
|
| HR 2389 Title III
|
$100,000
|
Description
|
|
|
|
Coordination of the Fire Safe Council and community
outreach and education with some HFR project
development in 2008 & 2009. |
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |
|
Project Name
|
2008-2010 Hazardous Fuels Reduction Projects’ Planning
|
Acres Proposed
|
575 acres
|
|
Project ID
|
08-03
|
Acres Treated
|
|
|
Funding Source
|
Amount |
|
Number of Parcels
|
30
|
| HR 2389 Title III
|
$40,000
|
Description
|
|
|
|
To provide project level planning and supervision
for community-level HFR projects. Technical and
professional staff will be hired by PCFSC to carry
out those tasks in at least 8 communities.
|
|
|
|
|
|
|
|
|
|
Implementation Contractor |
|
Treatment Contractor |
|
|
| Top of
Page |